Focus on R&D, manufacturing, sales, design and consulting services of pharmaceutical equipment.
Shanghai Yiling Fluid Machinery Equipment Co., Ltd. was founded in 2010. Since its establishment, the company has always been engaged in product research and development, production and sales in the field of pharmaceutical equipment. After more than 10 years of development, it has a modern chemical plant of 5000 ㎡, an office building of 300 ㎡, more than 50 sets of various processing centers, CNC lathes, welding equipment and testing equipment, and more than 60 technicians of all kinds. With many years of professional production experience, we have developed many products with independent intellectual property rights, such as sterile heat exchanger system, sterile diaphragm valve, split valve, RTP valve, through-wall system and other high-quality products. In particular, various products of ELING brand have operated safely and stably in more than 1000 pharmaceutical enterprises at home and abroad.
We always adhere to the principle of "quality comes from design, and professional achieve future", and deliver perfect products to users.
Brand History
1000+pharmaceutical enterprises have been cooperated
Manufacturing base
Professional team
Shanghai Yiling Fluid Machinery Equipment Co., Ltd.
Creating core values for clients, becoming better partners.
We focus on developing personalized solutions in life sciences, pharmaceuticals, and biotechnology fields.
Design stems from professional precipitation
Quality manufacturing, only for co-growing with customers
Our mission is to help more enterprises break through their celling and establish the next milestone in the booming wave of pharmaceutical industry.
According to the application requirements, our engineering design team reviews system security and generates design specifications for users‘ reference.
Create an overall 3D Plant STPE model to enable users to modify the system size and work with the engineering design team to select the best solution.
All parts are 100% inspected and assembled in the factory. Implement quality control procedures to ensure that the system operates as expected after establishment.
It can undertake factory inspects and carry out systematic test on the whole assembly process to verify whether the system operates according to the design specifications.
24 hours response, professional engineer video linkage, to solve any problems that customers have generated during the use of equipment.
In terms of the time as well as the channels that customers demand. The professional engineer goes from site to site at the time specified by the customer, completing installation as well as commissioning within the specified time period.